HUD financing for apartment construction.
Stonehaven brokers HUD 221(d)(4) financing for eligible apartment construction and substantial rehabilitation. We help connect your development budget, financing structure and cash plan.
What is HUD 221(d)(4)?
Section 221(d)(4) insures financing for eligible new multifamily rental construction and substantial rehabilitation. The structure combines the construction phase with permanent debt that can amortize over up to 40 years after construction, subject to the program and commitment terms.
It is worth considering when the project will remain rental housing, the sponsor can prepare a detailed submission and the schedule allows for design, reports and HUD review. It is not a substitute for a quick land closing or a loan designed to sell individual homes.
87% LTC, and when 90% may apply
For covered market-rate projects, current HUD ratios allow up to 87% of eligible cost with a 1.15 DSCR. The loan must also satisfy statutory unit limits and the other applicable sizing tests. A budget that qualifies under LTC can still fail the income test. Mortgagee Letter 2025-03.
Qualifying affordable housing may use 90% and 1.11 DSCR. The separate middle-income pathway can also permit 90% LTC and 1.11 DSCR, but only for projects meeting the issued policy. A plan to charge moderate rents is not enough.
Under the 2026 middle-income letter, the general framework includes at least half the units for households at or below 120% of area median income, an eligible program or specified alternative pathway, and a recorded use restriction generally lasting at least ten years. Read the middle-income guide before using 90% in a capital plan.
Build the cash plan around more than LTC
- Separate the eligible development budget from costs that cannot be financed.
- Identify land basis, existing debt and any equity credit. Do not assume an appraisal increase becomes spendable construction cash.
- Budget report deposits, financing and legal costs, construction interest, mortgage insurance, escrows and contingencies.
- Understand working-capital and operating-deficit reserve requirements, including when deposits must be made.
- Map the draw process against contractor payments. Funding a percentage of total cost does not eliminate temporary cash needs.
For covered multifamily construction, the revised MIP notice calculates upfront capitalized insurance over the construction period rounded up to whole years. The annual 0.25% figure is not necessarily the entire upfront premium. Review the MIP notice.
The site, plans and team need to fit together
A complete concept includes site control, zoning and entitlements, unit mix, market rents, plans, detailed costs, contractor experience, ownership and management. Environmental, floodplain, access and utility issues can change the design or schedule before a financing application is ready.
HUD construction also brings specific construction administration, inspections and applicable prevailing-wage requirements. Have the contractor and design team incorporate those requirements before treating an ordinary private construction budget as a HUD budget.
Major rehabilitation requires a coordinated scope and resident or relocation planning where applicable. The 2026 threshold update does not eliminate the other substantial rehabilitation tests.
Where build-to-rent fits
The issued 2026 guidance allows qualifying rental communities of detached homes, duplexes and triplexes to be considered under 221(d)(4) new construction. The community must meet the site, ownership, management and operating requirements. Individual home sales and partial collateral releases are not the intended exit.
Compare HUD build-to-rent financing with lot development financing if your business plan involves selling lots or completed homes.
Start the review before the closing deadline
Send Stonehaven the location, unit count, total budget, requested financing, site status, development team and intended rental hold. We can help organize the structure and determine which items need review first.
If land acquisition must close sooner, evaluate the interim financing and HUD path separately. An anticipated permanent loan is not an approval or a guaranteed takeout. Continue with application preparation and the cash-to-close example.
Bring your HUD deal to Stonehaven
Share the property, requested amount and timing. We help assess the financing options, prepare your request and coordinate the next steps.
Sources and editorial standards
Program research checked October 20, 2026. Issued HUD updates control over older summaries. This guide is educational, not a commitment, rate quote or HUD endorsement of Stonehaven.
- HUD MAP Guide, Chapters 3, 5, 8 and 11
- HUD Mortgagee Letter 2025-03: underwriting ratios
- HUD Mortgagee Letter 2026-01: middle-income housing
- HUD final notice 2025-18379: multifamily insurance premiums
- HUD Mortgagee Letter 2026-05: 2026 thresholds
- HUD Mortgagee Letter 2026-04: environmental guidance
- HUD Mortgagee Letter 2026-12: build-to-rent eligibility
Updated October 20, 2026. Editorial standards · Meet the team
Explore HUD financing
Compare the program, operating plan and capital needed.
- HUD financing overview
- Apartment acquisition and refinance
- Build-to-rent communities
- Residential care facilities
- HUD 223(f) vs. 221(d)(4): Which Route Fits?
- Bridge-to-HUD: Plan the Refinance Before Maturity
- HUD 87% LTC: How Much Cash Does a Builder Need?
- HUD Build-to-Rent Rules: What Builders Must Check
- HUD Middle-Income Housing: When 90% LTC Fits
- HUD Loan Checklist: Documents, Costs and Timing
Discuss your financing
HUD 221(d)(4) construction financing. Start with your name and email. Deal details are optional; we will review your inquiry and explain the next step.
Our team will review it and respond by your preferred method. This is not an approval or a rate quote.
Ready with the numbers? Use the detailed review · Book a conversation
Stonehaven acts as your mortgage broker. This is an initial inquiry; financing is subject to underwriting, documentation and program availability.